Acute Services Block and New Ward Block
At the Luton and Dunstable University Hospital site, we are planning development of an Acute Services Block and New Ward Block consisting of:
- Maternity services – delivery suite, 3 operating theatres, midwifery led birthing unit, triage, bereavement
- NICU – intensive care, high dependency care, special care, transitional care, parental accommodation
- Critical Care – a 22 bed critical care floor
- Surgical arrivals and recovery
- Operating theatres – 8 new operating theatres, including two hybrid theatres, first stage recovery 2. Maternity Ward Block
- A maternity ward block with maternity wards (antenatal and postnatal) and pre-operative lounge
Through this work, we will be able to:
- Tackle backlog maintenance and reduce risk in the highest risk areas (Critical care, Maternity, NICU and Theatres)
- Enable transformation of elective surgery through colocation of theatres
- Address national workforce challenges through a modern, flexible design
- Increase capacity
- Improve sustainability and efficiency
- Maintain and improve quality standards – Support patient-centred clinical services, with care delivered in modern, uplifting and fit for purpose environments
- Enable advances in medicine and technology
To allow work to progress on this site, a number of enabling works have been carried out since 2020. This includes
- Relocation of approximately 450 members of staff to a new location
- Upgraded electrical infrastructure
- Transfer of outpatient services to nearby Travelodge (obesity and rheumatology – Zone T)
- Demolition of office block
- Relocation of internal services
- Relocation of our Outpatient admin centre, to an off-site location near to the hospital
- Time critical enabling schemes across the site e.g. roadways, demolition
All these schemes are key to deliver excellent clinical outcomes, improve patient safety and enhance the patient experience.